Profit Analysis of Non Identical Repairable Units Subject to Two Phase Repair of System
Raeesa Bashir, Nafeesa Bashir, Shakeel A. Mir
Journal of Economics, Management and Trade · pp. 1–6 · Published 30 Apr 2019
10.9734/jemt/2019/v23i530143Abstract
The paper deals with the profit analysis of three non-identical units A, B, and C in which either Unit A or one of the units B and C should work for the successful functioning of the system. Two types of repairman are available in the system viz. Ordinary and Expert repairman. The expert repairman is called only when the system breaks down. Unit A gets priority for repair and is repaired by expert repairman while as Unit B and C is repaired by ordinary repairman if the system doesn’t fail totally. The failure time distribution of unit-A, B and C are taken as exponential. The distribution of time to repair of units is assumed to be general.
Cited by 2
Prawar Chaudhary, Anjali Naithani, H. D. Arora · Journal of Electrical Systems · 2024
Anjali Naithani, Smrity Khanduri, Surbhi Gupta · International Journal of System Assurance Engineering and Management · 2021
Related research
- Stochastic Analysis of Two Identical Unit Warm Standby System with Varying Demand of Production — shares topic coverage
Article metrics
Real usage data collected on this platform.
0
Page views
0
PDF downloads
0
Outbound clicks
2
Citations
Views by country
Approximate, from request IP at view time — not citizenship or institution. Countries with fewer than 5 views are grouped as "Other".
No views recorded yet.
Traffic sources
Referring site, by host.
No traffic recorded yet.
Views and downloads exclude known bots/crawlers. Citations combines this platform's own DOI-resolved index with each external source's own reported total — see Cited by above for individually listed citing works. Last refreshed 0 seconds ago.