Skip to content
Research Article Open access CC BY 4.0

Multiple Linear Regression Approach for Strategic Decisions on Industrial Productivity under Limited Available Budget

Oluwaseun Oluwagbemiga Ojo, David IfeOluwa Oladapo, Abiola Olufemi Ajayeoba, Basil Olufemi Akinnuli, Temitayo Daniel Omotayo

Asian Journal of Probability and Statistics · pp. 36–45 · Published 12 Dec 2020

10.9734/ajpas/2020/v10i130239

Abstract

Proper planning and improved productivity is highly desired in industrial settings to optimize the available resources when there is limited resources and to control excessive spending in time of surplus.  Productivity is achievable by good levels of Materials, Time and Labor inputs which needs to be measured scientifically in order to maintain long run profit. This study explored processing data and incorporated Statistical Package for Social Science (SPSS) to find the relationship and predict the response of the available budget with the inputs of Materials, Time and Labor using Olam Cocoa Processing Industry, Nigeria as case study. The analyses were done using Multiple Linear Regression Model developed (i.e. ), it was discovered that the inputs of the selected strategic decisions  collectively affected the response of the available budget with F-value of 88.48 but each of them cannot reduce or increase the amount of budget except for manpower which has 0.069 or 93.1 % significant effect on the available budget. Also, Coefficient of determination established a strong fitness of the relationship between the strategic decisions and the available budget with the value of 0.974 (or 97.4 %). It is recommended that the project manager should subject his decisions making into scientific measures rather than brainstorming so as to increase productivity in the company.

Multiple linear regression strategic decisions industrial productivity limited available budget coefficient of determination.

Cited by 2

Computational Logic for Proffering Solutions to Multi-Criteria Surrogate Problem in Manufacturing Equipment Procurement under Limited Available Budget

Oluwaseun Ojo, Oloye Olatunji, Timothy Ojo · 2024 International Conference on Science, Engineering and Business for Driving Sustainable Development Goals (SEB4SDG) · 2024

Comprehensive Review on Modelling and Optimization of Budget Allocation for Procurement of Alternative Gas Sources in Power Plant Industry

Ojo Oluwaseun Oluwagbemiga, Adedeji Bamidele, Akinnuli Basil Olufemi · 2024 International Conference on Science, Engineering and Business for Driving Sustainable Development Goals (SEB4SDG) · 2024

Article metrics

Real usage data collected on this platform.

0

Page views

0

PDF downloads

0

Outbound clicks

2

Citations

Views by country

Approximate, from request IP at view time — not citizenship or institution. Countries with fewer than 5 views are grouped as "Other".

No views recorded yet.

Traffic sources

Referring site, by host.

No traffic recorded yet.

Views and downloads exclude known bots/crawlers. Citations combines this platform's own DOI-resolved index with each external source's own reported total — see Cited by above for individually listed citing works. Last refreshed 0 seconds ago.