Hotelling’s Rule Verification of a Mining Project
Current Journal of Applied Science and Technology · pp. 55–59 · Published 10 Jun 2020
10.9734/cjast/2020/v39i1430700Abstract
On the basis of a real (confidential) mining project data the Hotelling’s rule fitting is verified and a new production schedule is proposed, which better fulfill the Hotelling rate rule than the previously program published by the investor. The intertemporal influences in project duration period are analyzed.
Cited by 0
No indexed citations yet.
Article metrics
Real usage data collected on this platform.
4
Page views
0
PDF downloads
10
Outbound clicks
0
Citations
Views over time
Views by country
Approximate, from request IP at view time — not citizenship or institution. Countries with fewer than 5 views are grouped as "Other".
Traffic sources
Referring site, by host.
Views and downloads exclude known bots/crawlers. Citations combines this platform's own DOI-resolved index with each external source's own reported total — see Cited by above for individually listed citing works. Last refreshed 0 seconds ago.