Data Mining and Statistical Analysis for Available Budget Allocation Pre-procurement of Manufacturing Equipment
O. O. Ojo, B. O. Akinnuli, P. K. Farayibi
Journal of Engineering Research and Reports · pp. 1–13 · Published 28 May 2019
10.9734/jerr/2019/v5i316926Abstract
In a situation where a decision maker faces problems of allotting the available budget on the strategic decisions in a manufacturing industry, data information plays an important role to maintain long run profit in the industry. Statistical analysis was incorporated to determine the correlational strength between the number of years and each of the strategic decisions, their confidence level, and the predicted values. This study identified the strategic areas of addressing the issues which are machine (), accessory (), spare part () and miscellaneous (), exploring the hidden data of the selected strategic decisions from International Brewery Plc, Ilesha and statistical analysis between the number of years and each of the selected strategic decisions. The model used in this work is simple linear regression while Statistical Analysis Software “SAS” was used for its applications. After exploring the hidden data from a case study, the suggested cost of procurement for machines, accessories, spare-parts and miscellaneous are: ₦119,975,000.00; ₦127,968,000.00; ₦134,965,000.00 and ₦33,491,500.00 respectively. From appendix, the probability of each of the strategic decision is less than 0.05 which implies that the Null-Hypothesis is rejected. The number of years has significant effect on Machines, Accessories, Spare-parts and Miscellaneous. As the number of years increases, the cost of procurement of the strategic decisions increases due to high rate of demand and consumption of their products. However, the cost of procurement may fall depending on the level of demand and maintenance culture. Besides, management of the company may ask decision maker to maintain the cost before procurement. This result may be used for further research on optimization of the available budget for equipment procurement.
Cited by 1
Oluwaseun Ojo, Oloye Olatunji, Timothy Ojo · 2024 International Conference on Science, Engineering and Business for Driving Sustainable Development Goals (SEB4SDG) · 2024
Related research
- Hybrid Methods for Credit Card Fraud Detection Using K-means Clustering with Hidden Markov Model and Multilayer Perceptron Algorithm — shares topic coverage
- Novel Data Mining Techniques for Incomplete Clinical Data in Diabetes Management — shares topic coverage
- Application of Lasso Regression to Model National Development Indicators and National Internet Usage — shares topic coverage
- Effect of Drug-Drug Interactions by Association Rule Discovery among the Elderly — shares topic coverage
- Analysis of Frequency and Functional Annotation of SSRs in ESTs of Cole Crops — shares topic coverage
Article metrics
Real usage data collected on this platform.
0
Page views
0
PDF downloads
0
Outbound clicks
1
Citations
Views by country
Approximate, from request IP at view time — not citizenship or institution. Countries with fewer than 5 views are grouped as "Other".
No views recorded yet.
Traffic sources
Referring site, by host.
No traffic recorded yet.
Views and downloads exclude known bots/crawlers. Citations combines this platform's own DOI-resolved index with each external source's own reported total — see Cited by above for individually listed citing works. Last refreshed 0 seconds ago.