Accelerating Laboratory Construction: Risk-Based Project Planning, Modular Prefabrication, and a Commissioning-First Delivery Framework
Asian Journal of Economics, Business and Accounting · pp. 261–278 · Published 13 Jan 2026
10.9734/ajeba/2026/v26i12140Abstract
The construction of laboratories is increasingly constrained by the need to deliver safe, compliant facilities rapidly, while also meeting decarbonisation and performance expectations. This scoping review maps peer-reviewed evidence on the acceleration of laboratories and laboratory analogue facilities through risk-based planning, modular prefabrication, and a commissioning-first delivery framework. Using the PCC framework and PRISMA-ScR reporting guidelines, searches of the Scopus and Web of Science databases (2015–2025) produced 461 records, of which 19 empirical studies met the inclusion criteria. The findings coalesced into three pillars of acceleration: (1) digital risk controls (e.g. interface governance, tolerance-aware coordination, and scan-enabled verification), which replace late discovery with early, testable gates; (2) treating modular prefabrication as a production-logistics system that requires early scope selection, interface freezing, and factory quality checks; and (3) commissioning-first readiness, where progress is defined by test outcomes, activation simulations, and operational stabilisation. Across the evidence base, speed gains were primarily achieved by preventing late rework rather than compressing tasks. This review did not involve protocol registration or risk-of-bias appraisal, but safeguards were in place, including PCC eligibility, dual screening, and standardised charting. Practical implications emphasise the risk-tiering of systems, 'progress-to-test' milestones, and the alignment of work packages to commissioning sequences. However, time-to-ready outcomes were reported inconsistently, which limited cross-case comparability. Future research should evaluate frameworks across laboratory typologies and regulatory settings and standardise acceleration metrics.
Cited by 0
No indexed citations yet.
Related research
- Influence of Project Planning Practices on Cost Overruns in The Construction of Trunk Roads in Kenya — shares topic coverage
- Cost Estimation and Analysis for Better Project Budgeting — shares topic coverage
Article metrics
Real usage data collected on this platform.
0
Page views
0
PDF downloads
0
Outbound clicks
0
Citations
Views by country
Approximate, from request IP at view time — not citizenship or institution. Countries with fewer than 5 views are grouped as "Other".
No views recorded yet.
Traffic sources
Referring site, by host.
No traffic recorded yet.
Views and downloads exclude known bots/crawlers. Citations combines this platform's own DOI-resolved index with each external source's own reported total — see Cited by above for individually listed citing works. Last refreshed 0 seconds ago.