The Impact of Stakeholder Involvement on Project Delays
Williams Kwame Boateng, Juliana Amma Danquah
Asian Journal of Economics, Business and Accounting · pp. 249–257 · Published 1 Apr 2025
10.9734/ajeba/2025/v25i41746Abstract
Background: Delay is a prevalent and intricate issue that negatively impacts the performance of construction projects. Despite the extensive research on project delays, only a limited number of studies have thoroughly synthesised and contrasted the reasons of delays according to project type. The study’s aim is to assess the impact of stakeholders’ involvement on project delays. Methods: The target demographic of this study comprised the China Geo-Engineering Construction Company. The sample size of 198 respondents. The purposive sample technique was employed. The research also employed a quantitative methodology utilising a survey design. Results: The analysis of the three distinct surveys about the responses of the clients, architects, quantity surveyors, inhabitants and consultants agree to the fact that Design changes, delays in payment to contractors, cost and time overrun; arbitration; total abandonment and litigation mostly accountable for the delay. Conclusions: The study concludes that there still exist a number of effects that put construction projects at great risk that have an effect on their performance.
Cited by 4
Ni Ketut Asriwinarti · 2025
Samuel Kwok Piu LIP, Wing Cheung TANG · International Journal of Latest Technology in Engineering Management & Applied Science · 2026
Showing 2 of 4 known citations — external sources report more than can currently be individually listed.
Related research
- Knowledge, Attitude and Male Involvement in Family Planning as Predictors to Contraceptive use in Kalabari Communities in Rivers State, Nigeria — shares topic coverage
- Measurement of Social Capital in Water Users Association through Analytical Hierarchy Process — shares topic coverage
- Youth Participation and Challenges in Rural Agribusiness: A Study of Agripreneurs in Haryana, India — shares topic coverage
- Involvement of Farm Households in Bush Buck (Gongronema latifolium) Production in Anambra State, Nigeria — shares topic coverage
- Performance of the Comprehensive Agricultural Support Programme (CASP), and Its Infrastructure Development Project at Dolidoli Village, Musekwa Valley, Limpopo Province: Solutions through Social Capital Adoption — shares topic coverage
Article metrics
Real usage data collected on this platform.
51
Page views
0
PDF downloads
8
Outbound clicks
4
Citations
Views over time
Views by country
Approximate, from request IP at view time — not citizenship or institution. Countries with fewer than 5 views are grouped as "Other".
Traffic sources
Referring site, by host.
Views and downloads exclude known bots/crawlers. Citations combines this platform's own DOI-resolved index with each external source's own reported total — see Cited by above for individually listed citing works. Last refreshed 0 seconds ago.