Skip to content
Research Article Open access CC BY 4.0

The Impact of Stakeholder Involvement on Project Delays

Williams Kwame Boateng, Juliana Amma Danquah

Asian Journal of Economics, Business and Accounting · pp. 249–257 · Published 1 Apr 2025

10.9734/ajeba/2025/v25i41746

Abstract

Background: Delay is a prevalent and intricate issue that negatively impacts the performance of construction projects. Despite the extensive research on project delays, only a limited number of studies have thoroughly synthesised and contrasted the reasons of delays according to project type. The study’s aim is to assess the impact of stakeholders’ involvement on project delays. Methods: The target demographic of this study comprised the China Geo-Engineering Construction Company. The sample size of 198 respondents. The purposive sample technique was employed. The research also employed a quantitative methodology utilising a survey design. Results: The analysis of the three distinct surveys about the responses of the clients, architects, quantity surveyors, inhabitants and consultants agree to the fact that Design changes, delays in payment to contractors, cost and time overrun; arbitration; total abandonment and litigation mostly accountable for the delay. Conclusions: The study concludes that there still exist a number of effects that put construction projects at great risk that have an effect on their performance.

Project delays stakeholders involvement construction industry

Cited by 4

Highway Construction in Hong Kong: Engineering Complexity, Environmental Governance, and Infrastructural Megaprojects in a Dense Urban Environment

Samuel Kwok Piu LIP, Wing Cheung TANG · International Journal of Latest Technology in Engineering Management & Applied Science · 2026

Showing 2 of 4 known citations — external sources report more than can currently be individually listed.

Article metrics

Real usage data collected on this platform.

50

Page views

0

PDF downloads

8

Outbound clicks

4

Citations

Views over time

Views by country

Approximate, from request IP at view time — not citizenship or institution. Countries with fewer than 5 views are grouped as "Other".

Traffic sources

Referring site, by host.

Views and downloads exclude known bots/crawlers. Citations combines this platform's own DOI-resolved index with each external source's own reported total — see Cited by above for individually listed citing works. Last refreshed 0 seconds ago.