Influence of Project Planning Practices on Cost Overruns in The Construction of Trunk Roads in Kenya
Joachim Aloo, Patrick Gudda, John Troon
Asian Journal of Economics, Business and Accounting · pp. 144–154 · Published 1 May 2026
10.9734/ajeba/2026/v26i52261Abstract
In ideal situation, road infrastructure projects should be completed within the planned budget, schedule, and scope to ensure efficient utilization of public resources and timely delivery of transport services that support economic growth and social development. Currently, cost overruns are a persistent challenge in Kenya’s road construction sector, particularly in national trunk road projects, where final expenditures frequently exceed planned budgets. These overruns undermine timely project delivery, strain public finances, and reduce value for money, hindering the achievement of Vision 2030. This study examined the influence of project planning practices that is scope definition, design planning, and funding allocation on cost overruns in national trunk road construction. The study was guided by the Systems Theory, Design Structure Theory, and Contingency Theory, the study adopted a retrospective design using secondary data from 46 KENHA projects implemented between 2005 and 2023. Data were extracted from KENHA and Kenya Roads Board. Document reviews were done on parliamentary reports, audit reports, and financiers including the World Bank and African Development Bank. Descriptive and inferential statistics were applied, with multiple linear regression determining relationships between planning practices and cost overruns. Results showed that scope definition, design planning changes, and funding allocation were significant drivers of cost overrun. The study concludes that strengthening feasibility studies, integrating modern design technologies, enhancing stakeholder engagement, and ensuring predictable funding flows are critical to minimizing budget deviations. The findings would offer actionable insights for policymakers, project managers, development partners, and scholars to improve planning frameworks, emphasizing efficiency, accountability, and sustainable infrastructure development. This underscores the need for well-structured project planning practices that minimize cost overruns and enhance the long-term performance of Kenya’s road infrastructure sector.
Cited by 0
No indexed citations yet.
Related research
- Leveraging Agile and Hybrid Models to Advance Sustainability Initiatives in the Oil and Gas Industry — shares topic coverage
- An Application of Reliability-analysis Techniques in Project Management — shares topic coverage
- Cloud-Based Solutions for Scalable Non-profit Project Management Systems — shares topic coverage
- Machine Learning Models for Predictive Risk Assessment in Healthcare IT Projects — shares topic coverage
- AI Tool for Sustainable Project Management Construction (SPMC) — shares topic coverage
Article metrics
Real usage data collected on this platform.
23
Page views
0
PDF downloads
9
Outbound clicks
0
Citations
Views over time
Views by country
Approximate, from request IP at view time — not citizenship or institution. Countries with fewer than 5 views are grouped as "Other".
Traffic sources
Referring site, by host.
Views and downloads exclude known bots/crawlers. Citations combines this platform's own DOI-resolved index with each external source's own reported total — see Cited by above for individually listed citing works. Last refreshed 0 seconds ago.