Construction Project Delay Factors of Public Universities in Ethiopia: A Structural Equation Modeling Approach
Abenet Yohannes, Ismael Mohammed, Dereje Alemu, Anley Gesese
Journal of Economics, Management and Trade · pp. 16–34 · Published 10 Feb 2023
10.9734/jemt/2023/v29i31081Abstract
Aims: This study aimed to identify causes of construction projects delay in Public Universities in Ethiopia. Study Design: This was a cross-sectional survey using quantitative method. Place and Duration of Study: Jigjiga, Haromaya, Dire Dewa and Kibrdhar universties between April and September 2022. Methodology: This study identified project delay factors and modelled the Partial Least Square Structural Equation (PLS-SEM) model. a structured questionnaire used to collect data from contractors, consultants and clients. Data were analyzed using SmartPLS4 software. Results: The findings show that Clients, Contractors, Consultants, Materials, and Labor related factors significantly affect delayed projects. Labour-related factors had the greatest impact on construction delay, while the external factor had an insignificant effect on project delay. The overall model had 73.1% explanatory power. These findings might support practitioners and decision-makers to focus on potential construction delay factors that might occur in their current or future projects.
Cited by 4
Abdul Habib Zaray, Ahmad Shah Irshad, Ahmad Shah Amin · Journal of Legal Affairs and Dispute Resolution in Engineering and Construction · 2026
Chiemela Victor Amaechi, Safi Ullah, Xiaopeng Deng · Engineering, Construction and Architectural Management · 2024
Showing 2 of 4 known citations — external sources report more than can currently be individually listed.
Related research
- Students Programme Satisfaction and Loyalty towards Their Departments and Institutions — shares topic coverage
- Perceived Environmental Effort and Sustainable Last-mile Delivery: Examining Their Effects on Green Purchasing Attitudes and Willingness to Pay a Premium — shares topic coverage
- Integrating Artificial Intelligence and Data Science for Financial Decision-making and Business Performance Optimization — shares topic coverage
- Effect of Compensation Package on Staff Intention to Quit in Technical University: A Structural Equation Approach — shares topic coverage
- Evaluating the Impact of Intra-Urban Logistics Constraints on Delivery Timeliness: Evidence of Market-Based Suppliers in Lagos, Nigeria — shares topic coverage
Article metrics
Real usage data collected on this platform.
34
Page views
0
PDF downloads
4
Outbound clicks
4
Citations
Views over time
Views by country
Approximate, from request IP at view time — not citizenship or institution. Countries with fewer than 5 views are grouped as "Other".
Traffic sources
Referring site, by host.
Views and downloads exclude known bots/crawlers. Citations combines this platform's own DOI-resolved index with each external source's own reported total — see Cited by above for individually listed citing works. Last refreshed 0 seconds ago.