Performance Evaluation of 780 Wp Rooftop Solar PV Power Backup System in Western Kenya
Wilkins K. Cheruiyot, Joel K. Tonui, Samuel C. Limo
Journal of Energy Research and Reviews · pp. 1–9 · Published 18 Jun 2021
10.9734/jenrr/2021/v8i130200Abstract
Aim: This study aimed to carry out performance analysis of a 780 Wp PV power backup system installed at a learning institution in Western. Study design: To achieve this goal, site solar radiation received, ambient temperatures, dc current and dc voltages were measured in order to carry out performance evaluation of the PV backup system. Place and Duration of Study: Department of electronics and electrical, Kaiboi Technical Training Institute in Nandi County, western Kenya was studied, between January 2020 and December 2020. Methodology: Performance of any PV system depends on the operating conditions (solar radiation, ambient/module temperature, etc.) available at the site (geolocation dependent), installation (tilt and orientation) of the arrays, and finally proper system sizing (PV array, battery, BOS). In this paper, standard performance parameters reported in literature were utilized to evaluate the performance of the studied PV backup system. The array comprises of four panels interconnected in series/parallel to produce an output power rating of 780 W. A Pyranometer was mounted on the plane of array (POA) to measure solar radiation intercepted by the PV array where daily data were acquired at an interval of five minutes. I-v data were also recorded. Different literature was reviewed to identify the way to do this work. Results: Based on the performance of the studied PV system, results obtained show that annual effective energy output is 3412.94 kWh, array efficiency range between 11.6% to 14.1% depending on amount of solar radiation, array yield of 4.88 kWh/kW, reference yield of 5.5 kWh/kW, annual average performance ratio of 76.3% and average array capture losses of 0.52 kWh/kW. Conclusion: It found that the PV backup system need ~5-6 hours to operate at the array’s rated output power, and that the PV backup system performance is adequate with regard to yield and performance ratios.
Cited by 3
Dipankar Pramanick, Jitendra Kumar · e-Prime - Advances in Electrical Engineering, Electronics and Energy · 2024
Shilpa Sambhi, Himanshu Sharma, Pankaj Kumar · Energies · 2022
Cornelius Masheti Lideli, Francis M. Gaitho, James Owuor · 2025
Related research
- Measurement and Prediction of Workplace Exposure to Solar Ultraviolet Radiation in Makurdi, Benue State, Nigeria — shares topic coverage
- The Improvement of the Irradiance Uniformity in LED Phototherapy to Match the Standard Requirements — shares topic coverage
- Experimental Determination of Panel Generation Factor for Apo Area of Federal Capital Territory in Nigeria — shares topic coverage
- Probabilistic Method for Estimating the Level of Reliability of Solar Photovoltaic Systems for Households in Ghana — shares topic coverage
Article metrics
Real usage data collected on this platform.
0
Page views
0
PDF downloads
0
Outbound clicks
3
Citations
Views by country
Approximate, from request IP at view time — not citizenship or institution. Countries with fewer than 5 views are grouped as "Other".
No views recorded yet.
Traffic sources
Referring site, by host.
No traffic recorded yet.
Views and downloads exclude known bots/crawlers. Citations combines this platform's own DOI-resolved index with each external source's own reported total — see Cited by above for individually listed citing works. Last refreshed 0 seconds ago.