Socioeconomic Impact of Development Projects on the Livelihood of Farmers: A Case Study of the Bui Dam Hydroelectric Project

Amankwah Emmanuel, Awafo Edward, Atta-Darkwa Thomas

Journal of Geography, Environment and Earth Science International · pp. 34–44 · Published 11 Feb 2020

10.9734/jgeesi/2020/v24i130192

Abstract

The development of major social projects such as hydroelectric dams, roads and mining often result in the loss of properties and sometimes relocation of the affected people or communities. This paper examined the impact of the Bui Dam Hydroelectric project on the livelihood of the people affected, especially farmers in the Bono Region of Ghana. The paper also reviewed the Environmental and Social Impact Assessment (ESIA) report of the project in line with the Environmental Protection Agency requirement, examined the compensation and the living conditions of the farmers in the affected communities. Interviews and focus group discussions of farmers in four communities were conducted which was later followed by the administration of questionnaires to seventy-five (75) farmers. The data obtained from the questionnaires were analyzed using descriptive statistics such as frequencies, percentages and Excel software for the development of charts. The review of the ESIA report of the Bui dam showed that an extensive ESIA was conducted with only few lapses outlined in the text. The interviews and the questionnaires  revealed  that  the  farmers  who  were  relocated  have  problems  with  land acquisition, soil fertility and irrigation facilities when they were moved to their new location. There were also concerns about inadequate payment of compensations and unfulfilled promises. However, about 97.3% of the respondents were comfortable at their new location because of the proximity to health services, access to good roads, nice buildings and provision of some basic social amenities such as light and water, as well as possible business and employment opportunities. The paper makes suggestions for improving compensations and resettlement schemes in Ghana.

Environmental and social impact assessment compensation farmers’ livelihood Bui hydro project resettlement.

Cited by 4

Assessing the influence of a dam reservoir on groundwater quality using geochemical and stable isotopes techniques

Jacob Asomaning, Cynthia Laar, Crentsil Kofi Bempah · Journal of African Earth Sciences · 2023

ASSESSING THE SOCIO-ECOLOGICAL FEASIBILITY OF DAM CONSTRUCTION PROJECTS ON CRITICAL LANDS: A STUDY ON THE ANALYSIS OF THE BENEFITS AND DESIGN CONCEPT OF RIVERSCAPE AS A TOURIST DESTINATION

Universitas Negeri Malang, Faculty of Social Science, Department of Geography, Malang, Indonesia, Ramli AKHMAD, SUMARMI SUMARMI · Geojournal of Tourism and Geosites · 2025

Evaluation of Negative Impacts of Metolong Dam, South of Phuthiatsana River in Lesotho

Thabang Sekamane · Environmental Ethics & Law · 2025

Statistical and isotopic analysis of sources and evolution of groundwater

Jacob Asomaning, Eric Ofosu Antwi, Cynthia Laar · Physics and Chemistry of the Earth, Parts A/B/C · 2023

Article metrics

Real usage data collected on this platform.

0

Page views

0

PDF downloads

0

Outbound clicks

4

Citations

Views by country

Approximate, from request IP at view time — not citizenship or institution. Countries with fewer than 5 views are grouped as "Other".

No views recorded yet.

Traffic sources

Referring site, by host.

No traffic recorded yet.

Views and downloads exclude known bots/crawlers. Citations combines this platform's own DOI-resolved index with each external source's own reported total — see Cited by above for individually listed citing works. Last refreshed 0 seconds ago.