Skip to content
Research Article Open access CC BY 4.0

Performance Evaluation of Olorunsogo Gas-Fired Power Plant Phase I

Eko, Michael A., Ale, Thomas O.

Journal of Engineering Research and Reports · pp. 176–186 · Published 1 Nov 2023

10.9734/jerr/2023/v25i101010

Abstract

Aim: The aim of this research is to evaluate the performance of the Olorunsogo gas-fired power plant phase 1, examines the reason(s) for not operating at full capacity, and proffers possible solution(s). Study of the Design: The power plant comprises of eight (8) numbers of 42MW unit gas turbine capable of evacuating 277MW. Methodology: To obtain electrical parameters from the gas turbine, a mathematical model for pressure using a simple open-cycle gas turbine was developed. The pressure was further converted to energy using principles of kinetic theory of gases. Hence, the efficiency and other performance indicators were calculated. Results: The study revealed an average operating capacity of 31.28MW. The average efficiency of the power plant in the period under review was 50.88%, as compared to the international standard practice of 65% and above. The average load factor and capacity factor was 11.25% and 11.54% respectively as compared to international standard practice of 50-80%, while the average reliability was 55.79%, as compared to international standard practice of 95%. Conclusion: The study further reveals that wastage of gas, downtime, and inadequate gas supply are the major factors against the full capacity operation of the power plant. The proffered possible solutions articulated in this study if implemented, will optimize the power plant's full-capacity operation.

Performance evaluation efficiency gas plant reliability installed capacity

References (9)

  1. 1 An approach for sustainable energy planning towards 100 % electrification of Nigeria by 2030 [DOI]
  2. 2 A review of Nigerian energy access studies: The story told so far [DOI]
  3. 3 Lange's handbook of chemistry. 12th edition [DOI]
  4. 4 Viability of Hydroelectricity in Nigeria and the Future Prospect [DOI]
  5. 5 Comparative thermo-economic analysis of multi-fuel fired gas turbine power plant [DOI]
  6. 6 Physical Chemistry [DOI]
  7. 7 Performance Evaluation of Alaoji Thermal Power Plant [DOI]
  8. 8 Techno-economic analysis of combined cycle power plants for electricity generation in Nigeria [DOI]
  9. 9 Journal of Energy Technologies and Policy [DOI]

Cited by 1

Evaluation of Operational Performance Factors and Improvement Strategies for a Typical Power Generation System in Nigeria

I. P. Nkuku, N. G. Nwaji, D. A. Ekpechi · Iranica Journal of Energy and Environment · 2025

Article metrics

Real usage data collected on this platform.

7

Page views

0

PDF downloads

0

Outbound clicks

1

Citations

Views over time

Views by country

Approximate, from request IP at view time — not citizenship or institution. Countries with fewer than 5 views are grouped as "Other".

Traffic sources

Referring site, by host.

Views and downloads exclude known bots/crawlers. Citations combines this platform's own DOI-resolved index with each external source's own reported total — see Cited by above for individually listed citing works. Last refreshed 0 seconds ago.