Managing of Change Orders in Public Construction Projects: A Framework for Governmental Projects in Jordan
Waseem Al-Adwan, Moawiah Alnsour, Zakaria Al-Omari
Journal of Economics, Management and Trade · pp. 36–53 · Published 27 May 2022
10.9734/jemt/2022/v28i530411Abstract
Change orders have a substantial impact on construction projects. In the Change orders, there is no "optimal solution", but we are always trying to get as close to the "optimality" as possible. This research aims to bridge this knowledge gap, by presenting a comparative study between Jordanian legislation and legislation in neighboring countries, in addition to determining the effect of change orders in a sample of previous projects on time and cost, in addition to identifying the reasons that led to these changes. Interview questions for experts in this field that include most of the parties related to changes to amend the current framework and submit a proposal to amend the systems for changes. This research studied the variation orders and their impact on the basic elements of projects, especially government projects, as well studied the legislative systems that rule variation orders and the most important differences between them and their conflict with each other. In the results, developing a framework for managing change orders was made. This framework can contribute to avoiding changes or how solving them or reducing their effects in the field of construction.
References (18)
- 1 Successful qualitative research: A practical guide for beginners [DOI]
- 2 Research methods for construction
- 3 Journal of Construction Engineering and Management
- 4 Preparing for Interview Research: The Interview Protocol Refinement Framework [DOI]
- 5 Taxonomy for change causes and effects in construction projects [DOI]
- 6 Cost Overruns and Failure in Project Management: Understanding the Roles of Key Stakeholders in Construction Projects [DOI]
- 7 Construction Project Administration
- 8 Research methods in rural studies: Qualitative, quantitative and mixed methods [DOI]
- 9 Examining Factors Affecting Budget Overrun of Construction Projects Undertaken through Management Procurement Method Using PLS-sem Approach [DOI]
- 10 Change Order Provisions under National and International Standard Forms of Contract [DOI]
- 11 Controlling Of Variation Orders in Highway Projects in Jordan [DOI]
- 12 A comparative study of causes of change orders in public construction project in Nigeria and Oman
- 13 Painless Project Management: A Step-by-Step Guide for Planning, Executing, and Managing Projects
- 14 Causes, Nature and Effects of Variations in Highways [DOI]
- 15 General conditions of the contract
- 16 Successful Qualitative Research: A practical guide for beginners [DOI]
- 17 A Guide to the project management body of knowledge [DOI]
- 18 Sample Size Policy for Qualitative Studies Using In-Depth Interviews [DOI]
Cited by 7
Mohammed A. K. A. Al-Btoush, H. Almashaqbeh, T. Rawashdeh · Frontiers in Built Environment · 2026
V. Nguyen, Vachara Peansupap, Tanit Tongthong · Journal of Engineering, Design and Technology · 2025
J. Ramadhan, M. Waty · Engineering, Technology & Applied Science Research · 2025
Yara Mattar, Mhd Amer Alzaim, Mariam AlAli · Buildings · 2024
Showing 4 of 7 known citations — external sources report more than can currently be individually listed.
Related research
- Biotypes and Enterotoxigenicity of Staphylococci Isolated from Camel’s Meat in Jordan — shares topic coverage
- Analysis of Egg Production System at Al-Karak Governorate in Jordan — shares topic coverage
- Broiler Value Chain: Socioeconomic Plan for Commercial Broiler Farm in Jordan — shares topic coverage
- Impact of External Audit Quality on Earnings Management by Banking Firms: Evidence from Jordan — shares topic coverage
- The Engineering of an Undergraduate Nuclear Education Program in Jordan — shares topic coverage
Article metrics
Real usage data collected on this platform.
34
Page views
0
PDF downloads
6
Outbound clicks
7
Citations
Views over time
Views by country
Approximate, from request IP at view time — not citizenship or institution. Countries with fewer than 5 views are grouped as "Other".
Traffic sources
Referring site, by host.
Views and downloads exclude known bots/crawlers. Citations combines this platform's own DOI-resolved index with each external source's own reported total — see Cited by above for individually listed citing works. Last refreshed 0 seconds ago.