Skip to content
Research Article Open access CC BY 4.0

From OEM Dependence to Data-driven Maintenance: A Maintenance Strategy and Integrated Logistics Support Framework for Poorly Supported Mining Drill Rigs

Souleymane Ramdé, Fabrice Benin, Tizane Daho

Current Journal of Applied Science and Technology · pp. 225–237 · Published 24 Sep 2026

10.9734/cjast/2026/v45i104776

Abstract

Aims: To develop a transferable method for constructing a maintenance strategy framework and an integrated logistics support scheme for heavy mining equipment operated without a mature original equipment manufacturer (OEM) support ecosystem, and to translate that framework into executable enterprise resource planning (ERP) parameters. Study Design: Methodologically oriented industrial case study, building on a companion failure diagnosis. Place and Duration of Study: Down-the-hole drill fleet of a West African mining operation; operating data covering 2024–2025. Methodology: The method proceeds in five steps. Criticalities from failure mode, effects, and criticality analysis (FMECA) and fault tree analysis (FTA) are converted into differentiated maintenance policies through three explicit decision rules (fixed-interval, condition-based, controlled run-to-fail). Target service lives are derived through three documented rules distinguishing evidence-based recontextualisation, design reset after modification, and nominal retention under censored evidence; each value is coupled to a condition-monitoring guard and a revision trigger. Configuration control addresses failure mechanisms of design origin. The framework is made executable through enterprise resource planning types — consumption-driven (VM) and order-driven (PD) — with coverage-based stock bounds and is completed by the four integrated logistics support dimensions. Results: A consolidated framework covering twenty-three items across three critical subsystems was obtained. The engine target life was recontextualised from a nominal 15,000 h, transposed by analogy, to 6,000 h because no engine had exceeded 6,000 h (mean ≈ 2,700 h). The compressor coupling, whose observed lives ranged from 109 h to about 3,430 h, was redesigned and standardised, and a provisional 12,000 h planning horizon aligned with the compressor grouping interval was adopted. Three configuration modifications were specified, one of which — dual fuel separation — was subsequently incorporated by the manufacturer into a later machine. Conclusion: The framework is designed to shift heavy replacements from unplanned OPEX towards planned CAPEX and to secure critical-part availability. Life-cycle costing and before–after quantification remain to be performed.

Maintenance strategy framework integrated logistics support target service life reliability-centred maintenance spare parts criticality ERP planning parameters mining drill rigs

Cited by 0

No indexed citations yet.

Article metrics

Real usage data collected on this platform.

23

Page views

0

PDF downloads

4

Outbound clicks

0

Citations

Views over time

Views by country

Approximate, from request IP at view time — not citizenship or institution. Countries with fewer than 5 views are grouped as "Other".

Traffic sources

Referring site, by host.

Views and downloads exclude known bots/crawlers. Citations combines this platform's own DOI-resolved index with each external source's own reported total — see Cited by above for individually listed citing works. Last refreshed 0 seconds ago.