Abstract

Aims: Financial factors are significantly related to the performance of construction firms. Moreover, total failure of the construction firms is higher than the percentage of failures of firms in other industries. Therefore, this study was conducted to achieve three objectives. First, this study identifies the failure factors of Bumiputera contractors by using ratio analysis. For this analysis, four financial variables were chosen, which are capital liquidity, profitability, debt, and the efficiency of financial management/assets. The second objective identifies the causes of failure associated with the four financial variables. The third objective identifies the elements of effective financial management. Methodology: To achieve these objectives, data collection involved the use of qualitative (ratio analysis and interviews) and quantitative (questionnaire) research methods that led to the concept of triangulation. Respondents to the qualitative study consisted of 6 Bumiputera construction firms, while the quantitative data had 54 respondents. Findings: The findings of the analysis showed the firms had shortage of capital to finance projects, received small profit from construction projects, carried higher debt, and were less efficient in asset management. The study confirmed that capital problems experienced by the firms resulted from the small capital at the start of their business, and the late payment from the clients (progress and final payment). Small profit margin was due to the increase in the prices of building materials, low price of contracts, and delays in project completion. Analysis showed that the higher debt of firms was caused by delays of the payment of the project owner, small capital base, and late receipt of advance payments. Moreover, asset management of the firm was said to be less efficient due to the level of ownership of fixed assets at a higher rate, and the improper management of cash flow. Conclusion: It was observed that construction companies put themselves up for failure without effective financial practices.

Construction industry financial management financial failure financial performance and construction firms.

References (48)

  1. 1 Qualitative evaluation and research methods
  2. 2 Language Learning Strategies: What Every Teacher Should Know [DOI]
  3. 3 Educational Research: Competencies for Analysis and Application
  4. 4 Understanding Reliability and Validity in Qualitative Research [DOI]
  5. 5 Causes of delay in large construction projects [DOI]
  6. 6 Causes and effects of delays in Malaysian construction industry [DOI]
  7. 7 Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study [DOI]
  8. 8 The effects of construction delays on project delivery in Nigerian construction industry [DOI]
  9. 9 Causes of Delay in Large Building Construction Projects [DOI]
  10. 10 Delays in construction projects: The case of Jordan [DOI]
  11. 11 Corporate Collapse: The Causes and Symptoms [DOI]
  12. 12 Capital structure and profitability of the property and construction sectors in Hong Kong [DOI]
  13. 13 Business failures in the construction industry [DOI]
  14. 14 Industry financial ratios—application of factor analysis in Turkish construction industry [DOI]
  15. 15 Causes of Contractor's Business Failure in Developing Countries: The Case of Palestine
  16. 16 Business Failure in Construction Industry [DOI]
  17. 17 Corporate recovery : successful turnaround strategies and their implementation
  18. 18 A methodology for predicting company failure in the construction industry [DOI]
  19. 19 Financial Performance Analysis for Construction Industry [DOI]
  20. 20 Model on cash flow forecasting and risk analysis for contracting firms [DOI]
  21. 21 Systems analysis of project cash flow management strategies [DOI]
  22. 22 Empirical Study of Strategic Performance of Global Construction Firms [DOI]
  23. 23 Applying Z-score model to distinguish insolvent construction companies in China [DOI]
  24. 24 Construction Accounting and Financial Management
  25. 25 A hybrid financial analysis model for business failure prediction [DOI]
  26. 26 Critical Factors To Company Success In The Construction Industry [DOI]
  27. 27 Resource-Based View and Critical Success Factors: A Study on Small and Medium Sized Contracting Enterprises (SMCEs) in Malaysia [DOI]
  28. 28 Causes of Delay in MARA Management Procurement Construction Projects [DOI]
  29. 29 Risk Of Late Payment In The Malaysian Construction Industry [DOI]
  30. 30 Association of Researchers in Construction Management (ARCOM)
  31. 31 Contractor Failure: Analysis [DOI]
  32. 32 Company-Level Cash-Flow Management [DOI]
  33. 33 Prediction of solvency in construction companies [DOI]
  34. 34 E-bidding proposal preparation system for construction projects [DOI]
  35. 35 A review of financial ratio tools for predicting contractor insolvency [DOI]
  36. 36 Construction firms at the crossroads in Hong Kong [DOI]
  37. 37 Towards more flexible and accurate cash flow forecasting [DOI]
  38. 38 Project schedule influenced by financial issues: Evidence in construction industry [DOI]
  39. 39 Prediction of contractor default probability using structural models of credit risk: an empirical investigation [DOI]
  40. 40 Management efficiency performance of construction businesses: Australian data [DOI]
  41. 41 Cash flow management in construction firms
  42. 42 Monitoring financial health of contractors at the aftermath of the Asian economic turmoil: a case study in Hong Kong [DOI]
  43. 43 Evaluating the financial health of construction contractors [DOI]
  44. 44 Late and Non-Payment Issues in the MalaysianConstruction Industry ¿C Consultants¿¿ Perspectives
  45. 45 Estimation of Minimum Working Capital for Construction Projects in Malaysia [DOI]
  46. 46 Financial management effectiveness of Indonesia's construction state-owned enterprises
  47. 47 Payment issues - the present dilemmas of malaysian construction industry
  48. 48 Payment woes among Malaysian contractors

Cited by 14

Enhancing the Knowledge of Construction Business Failure: A Social Network Analysis Approach

Rayan Assaad, Islam H. El-adaway · Journal of Construction Engineering and Management · 2020

Essential elements for Bumiputera contractors’ training and development framework design in Malaysia

Syed Muzaffar Syed Mohamad, Saipol Bari Abd-Karim, Norhisham Mohd Nor · AIP Conference Proceedings · 2023

Assessing the Risk Level of the Challenges Faced In Construction Projects

A. Alameri, A. S. A. M. Alhammadi, A. H. Memon · Engineering, Technology & Applied Science Research · 2021

The Effect of Financial Performance on Firm Value: The Moderating Role of Corporate Governance

Raisa Septiningdya Mas’ud, Titik Mildawati, David Efendy · South Asian Journal of Social Studies and Economics · 2025

Showing 5 of 14 known citations — external sources report more than can currently be individually listed.

Article metrics

Real usage data collected on this platform.

73

Page views

0

PDF downloads

41

Outbound clicks

14

Citations

Views over time

Views by country

Approximate, from request IP at view time — not citizenship or institution. Countries with fewer than 5 views are grouped as "Other".

Traffic sources

Referring site, by host.

Views and downloads exclude known bots/crawlers. Citations combines this platform's own DOI-resolved index with each external source's own reported total — see Cited by above for individually listed citing works. Last refreshed 0 seconds ago.