Construction Project Delay Factors of Public Universities in Ethiopia: A Structural Equation Modeling Approach

Abenet Yohannes, Ismael Mohammed, Dereje Alemu, Anley Gesese

Journal of Economics, Management and Trade · pp. 16–34 · Published 10 Feb 2023

10.9734/jemt/2023/v29i31081

Abstract

Aims: This study aimed to identify causes of construction projects delay in Public Universities in Ethiopia. Study Design: This was a cross-sectional survey using quantitative method. Place and Duration of Study: Jigjiga, Haromaya, Dire Dewa and Kibrdhar universties between April and September 2022. Methodology: This study identified project delay factors and modelled the Partial Least Square Structural Equation (PLS-SEM) model. a structured questionnaire used to collect data from contractors, consultants and clients. Data were analyzed using SmartPLS4 software. Results: The findings show that Clients, Contractors, Consultants, Materials, and Labor related factors significantly affect delayed projects. Labour-related factors had the greatest impact on construction delay, while the external factor had an insignificant effect on project delay. The overall model had 73.1% explanatory power. These findings might support practitioners and decision-makers to focus on potential construction delay factors that might occur in their current or future projects.

Construction project structural equation modelling time overrun SmartPLS

References (48)

  1. 1 Statistical Power Analysis for the Behavioral Sciences [DOI]
  2. 2 Determining Sample Size for Research Activities [DOI]
  3. 3 Structural Equation Models with Unobservable Variables and Measurement Error: Algebra and Statistics [DOI]
  4. 4 The partial least squares approach for structural equation modeling.
  5. 5 \nThe use of partial least squares path modeling in international marketing [DOI]
  6. 6 Structural Equation Models with Unobservable Variables and Measurement Error: Algebra and Statistics [DOI]
  7. 7 Use of partial least squares (PLS) in strategic management research: a review of four recent studies [DOI]
  8. 8 Causes of delay in large construction projects [DOI]
  9. 9 Causes and effects of delays in Malaysian construction industry [DOI]
  10. 10 Predictive Analytics in Information Systems Research1 [DOI]
  11. 11 Causes of construction delay: traditional contracts [DOI]
  12. 12 Factors influencing construction time and cost overruns on high-rise projects in Indonesia [DOI]
  13. 13 Cost escalation and schedule delays in road construction projects in Zambia [DOI]
  14. 14 The effects of construction delays on project delivery in Nigerian construction industry [DOI]
  15. 15 Significant factors causing delay in the UAE construction industry [DOI]
  16. 16 Causes of Delay in Large Building Construction Projects [DOI]
  17. 17 Delays in construction projects: The case of Jordan [DOI]
  18. 18 The significant factors causing delay of building construction projects in Malaysia [DOI]
  19. 19 Causes of Delay in Building Construction Projects in Egypt [DOI]
  20. 20 Causes of delays in Saudi Arabian public sector construction projects [DOI]
  21. 21 Using PLS-SEM technique to model construction organizations' willingness to participate in e-bidding [DOI]
  22. 22 Delay Mitigation in the Malaysian Construction Industry [DOI]
  23. 23 Causes of delays in the construction industry in Lebanon [DOI]
  24. 24 Construction claims in United Arab Emirates: Types, causes, and frequency [DOI]
  25. 25 PROBLEMS OF PROJECTS AND EFFECTS OF DELAYS IN THE CONSTRUCTION INDUSTRY OF PAKISTAN [DOI]
  26. 26 Delay in public utility projects in Saudi Arabia [DOI]
  27. 27 CAUSES AND EFFECT OF DELAY ON PROJECT CONSTRUCTION DELIVERY TIME
  28. 28 Studying the relationship between causes and effects of poor communication in construction projects using PLS-SEM approach [DOI]
  29. 29 A Study on Causes of Delay in Road Construction Projects across 25 Developing Countries [DOI]
  30. 30 Causes of Delay in the Construction Industry [DOI]
  31. 31 Assessing Extension of Time delays on major projects [DOI]
  32. 32 Impact of construction materials on project time and cost in Kuwait [DOI]
  33. 33 Factor selection for delay analysis using Knowledge Discovery in Databases [DOI]
  34. 34 Significant Factors Causing Delay and Cost Overruns in Construction of Groundwater Projects in Ghana [DOI]
  35. 35 Modeling Causes of Cost Overrun in Large Construction Projects with Partial Least Square-SEM Approach: Contractor's Perspective [DOI]
  36. 36 A study of the factors affecting construction time in Western Australia [DOI]
  37. 37 Contractors' Perception of factors Contributing to Project Delay: Case Studies of Commercial Projects in Klang Valley, Malaysia
  38. 38 Investigating Causes of Construction Delay in Ethiopian Construction Industries [DOI]
  39. 39 Detection and In-Depth Analysis of Causes of Delay in Construction Projects: Synergy between Machine Learning and Expert Knowledge [DOI]
  40. 40 A change management model for Saudi construction industry [DOI]
  41. 41 New Zealand Building Project Cost and Its Influential Factors: A Structural Equation Modelling Approach [DOI]
  42. 42 Delay Causes and Types in Nigerian Power Construction Projects [DOI]
  43. 43 “Claimsmanship”: Current Perspective [DOI]
  44. 44 IDENTIFICATION OF CRITICAL DELAY FACTORS IN CONSTRUCTION
  45. 45 Delay, Disruption and Acceleration Claims [DOI]
  46. 46 A primer on partial least squares structural equation modeling (PLS-SEM) [DOI]
  47. 47 Predictive Analytics in Information Systems Research [DOI]
  48. 48 Assessment of Time and Cost Overruns in Construction Projects (Case Study at Defense Construction Enterprise)

Cited by 4

Deciphering Construction Delays in a War-Affected Region: A Triangular Perspective from Clients, Regulatory Bodies, and Contractors

Abdul Habib Zaray, Ahmad Shah Irshad, Ahmad Shah Amin · Journal of Legal Affairs and Dispute Resolution in Engineering and Construction · 2026

Utilising factor analysis on political risks including strategies of managing firm-specific risk factors for multinational construction projects in Pakistan

Chiemela Victor Amaechi, Safi Ullah, Xiaopeng Deng · Engineering, Construction and Architectural Management · 2024

Showing 2 of 4 known citations — external sources report more than can currently be individually listed.

Article metrics

Real usage data collected on this platform.

53

Page views

0

PDF downloads

20

Outbound clicks

4

Citations

Views over time

Views by country

Approximate, from request IP at view time — not citizenship or institution. Countries with fewer than 5 views are grouped as "Other".

Traffic sources

Referring site, by host.

Views and downloads exclude known bots/crawlers. Citations combines this platform's own DOI-resolved index with each external source's own reported total — see Cited by above for individually listed citing works. Last refreshed 0 seconds ago.