Carrot harvesting is one of the critical operations and is done once the carrot is matured after 90 – 110 days. Carrots grow on ridges and are harvested after loosening from the soil surface and pulling out roots by grasping the top. For harvesting carrots manually in one hectar...
Open access
Research Article10.9734/ijpss/2022/v34i1030918
In the India, farmers encounter issues with trimming boundary bushes and unwanted vegetation that obstruct roadsides, railway tracks, and electricity poles. This overgrowth is particularly noticeable after rainfall. When it encroaches onto roadsides, it creates obstacles for mach...
Open access
Research Article10.9734/jsrr/2024/v30i11823
In a Saurashtra region, farmers are facing a major problem with the trimming of boundary bushes or cutting of the fence of agriculture. In addition to this, unwanted bush also obstructs farm operations, roads, and electricity poles. Currently, bush-cutting is done through manual...
Open access
Research Article10.9734/jeai/2022/v44i112067
For the arid and semi-arid region of Devbhumi Dwarka in Gujarat, where soil moisture issue is prominent, a GIS-based approach is needed to develop models for estimation of soil moisture. In this study, Landsat and Sentinel data were used to develop multiple soil moisture indices....
Open access
Research Article10.9734/ijecc/2024/v14i13788